Gears Up!!

LAFUMA/MILLET G7 SUMMIT SERIES 2010/11 - MOUNT CHAMAH (2171m)


-->
EXPEDITION DATES 2010 : 23-25 July, 24-26 Sept, 22-24 Oct
DEPARTURE DATE : Day 0 (2100hrs on the eve of expedition date)
REGISTRATION DATE LINE : 14 Days from Day 0
PRE EXPEDITION CHAT : 7 Days from Day 0 (exact date & time will be advised to confirmed participants)
GROUP SIZE : Minimum 12 participants
TRAVEL ARRANGEMENT : Car pool, Self Drive or Other Arrangements for those out of Klang Valley
ESTIMATED PERSONAL COST: RM100 – RM150 (travel, fuel, toll, meals & miscellaneous)

Information Summary
G7 Ranking : 5th Highest Peak in Peninsular Malaysia
Location : Titiwangsa Main Range, Perak Kelantan Border
Lat Long : 5º13’N 101º34’E
Nearest Town : Gua Musang, Kelantan
Final Preparation Area : Gua Musang, Kelantan
Trail Head : Pos Rekom
Route (RETURN) : Gua Musang – 4WD off-road ride – Pos Rekom – Camp Pakma - Camp Tongkat Ali – First False Peak - Summit
Trail Length : 10.3Km (give or take 100m)
Ascent : 900m – 2171m
Terrain : 4WD off-road ride, Multiple River Crossing, Multiple uphill & downhill, dry to muddy trails and root clambering
Campsites with H20 : Pos Rekom, Camp Pakma, Camp Tongkat Ali
Last Water Point : Camp Tongkat Ali
Scenic Rating : 6/10 (10/10 being awesome)
Cellular Network : Poor to Medium Coverage at the summit for CELCOM, MAXIS & DIGI
Difficulty + Duration : 6/10 @ 3D/2N & 7/10 @ 2D/2N (1 being easy and 10 being very difficult)

EXPEDITION FLOW SUMMARY:
DAY 0
2100hrs – Meet up point will be Lafuma Pro Shop, Bangsar (Please have dinner before we meet)
- Convoy to Gua Musang, Kelantan
- Overnight camping at Gua Musang
DAY 1
0800hrs – Breakfast & Final Packing
– 4WD Ride to trail head (4 Hours)
– Start Ascent
- Lunch break for 30 minutes
1900hrs – Sweeper expected to reach Camp Tongkat Ali
2000hrs – Dinner
DAY 2
0800hrs – Breakfast & Break Camp
0900hrs – Start Summit attempt
- Lunch break for 30 minutes
1900hrs – Sweeper expected to reach CHAMAH summit
2000hrs – Dinner
DAY 3
0630hrs – Sunrise, Pictures & Stuff
0800hrs – Breakfast & Break Camp
0830hrs – Start Descent
- Lunch break for 30 minutes
1500hrs – Sweeper expected to reach Pos Rekom
- 4WD Ride to Trail Head (4 Hours)
2000hrs – Dinner
- Convoy back to Kuala Lumpur
- 30 min stop for RnR
- Kuala Lumpur safe and sound

Shop Online



FEE STRUCTURE:
BASIC – RM225 per person (Compulsory)
(Includes Professional Guide(s), Permit, Police Reports, Permission, 4WD Transfers, Internal & External Radio Communication & Group Advanced First Aid Kit)
CATERING COST – RM90 per person (Optional)
(Includes Breakfast, Lunch, Dinner, Trail Food & 24 Hour Emergency Ration, also the Chef)
EQUIPMENT RENTAL – RM40 per person (Optional)
(Includes Tent on triple sharing basis & group communal equipment)
GROUP OR PERSONAL PORTER – RM150 per porter per day (Optional)
(Maximum of 15Kg load per porter, extra’s chargeable at RM12 per Kg)
Note: 1) The above itinerary is dynamic and subject to change according to team progress & other components
2) A detailed expedition flow plan will be given for confirmed participants.

To take part, kindly register HERE.

Comments

Popular posts from this blog

Rekreasi Hujung Minggu di Hutan Lipur Bukit Lagong (14/03/09)

LAFUMA/MILLET G7 SUMMIT SERIES 2010/11 -MOUNT YONG YAP

Lafuma / Millet G7 Summit Series 2010/11